Electrical Construction Project Documents
Division 26. We are heavy on the project documents . Plans and specifications.
Electrical Mechanical Power Takeoff
Takeoff into the mechanical power and controls Division 26 Electrical Estimating. We looking at just is required to wire this and get it labored and the material into the estimate.
Heavy Industrial
The work in side industrial site difficult and time consuming. The estimates need to be "Spot On" for the electrical contractor. This something everything from the physical location as it apllies to hazadrous classified location. Power,controls, plc, fire detection and more in the electrial scope to be takeoff.
Since 2004
Electrical Estimate
Estimator: John Stanulis
Phone: 217-899-5485
Email: [email protected]
Projects Email: [email protected]
Estimating system used : Vision EBM EPIC Material and PlanSwift Onscreen Takeoff. Others systems call to talk about. Accubid, ConEst, McCormick, Viewpoint estimation. Add-on programs during estimate can be "Construction Online", custom Excel spread sheets and possibly "ProCore". Note for 2021 another estimating system that we have is "ESTICOM" which is part of "ProCore". This we have separately. This is in the setup of custom data bases and testing phase at this time. A roll out is expected midyear or sooner to go live.
Pricing by the hour, day, week and more with additional cost drawing copies and system charge per estimate per week.
Plans To The Estimator
Getting us the project documents. Drawings and specifiacations.